欧美一级高清免费a-欧美一级高清片欧美国产欧美-欧美一级高清片在线-欧美一级高清视频在线播放-欧美一级高清在线观看-欧美一级黄色录像

Welcome to Shenzhen Zhongyuan Plastic Co., Ltd!

News



Tel:(0755)27151698
Fax:(0755)27150611
Mailbox:szzyzcl@163.com / szzy@szzy99.com
Add:Building A1 and A2, No.1 Industrial Zone, yuliu property company, Gongming town, Bao'an District, Shenzhen
Industry information

當前位置:

首頁 News Industry information

Solution to lack of glue in plastic shell

Release time:2023-11-29

Lack of glue, also known as insufficient filling, is one of the common problems in the process of injection molding. The injection molding part is not full, and the existing bubbles, cavities, shrinkage holes, etc. are inconsistent with the standard template, which is called lack of glue. So how to solve itPlastic shellWhat about the lack of glue?

圖片2.png


The following are the reasons for the lack of glue in the plastic shell and its improvement measures:


① Mold: a. the design of the gating system is unreasonable. The gating system is the channel for the melt to enter the mold cavity, which has a great impact on the molding quality of the plastic parts. The gate is not parallel and the gate is not located at the wall thickness; b. The exhaust structure of the mold is poor; c. Impurities or cold materials in the melt block the flow channel; d. Mold temperature does not meet the requirements. Improvement measures: improve the pouring system, increase the exhaust of the mold, remove the impurities of the compound, and increase the mold temperature.


② Raw materials: a. the water content of raw materials is too large; b. Volatile substances in raw materials exceed the standard; c. There are too many impurities or recycled materials in the raw materials. Improvement measures: barbecue raw materials and increase raw materials.


③ Injection molding machine: A. insufficient injection quantity: for example, 180t products are produced by 150t machines. b. The nozzle is blocked by foreign matters and the nozzle hole is too small; c. Insufficient supply of raw materials: if the barrel is blocked, the nozzle material will affect the blanking; d. Check valve failure; e. Insufficient injection stroke. Improvement measures: increase the injection volume and increase the injection stroke.


④ Molding operation: A. mold temperature is too low; b. The injection pressure is too low; c. The pressure holding time is too short; d. The injection speed is too slow; e. The melt temperature is too low. Improvement measures: increase the mold temperature, increase the injection pressure, maintain the pressure time, and improve the injection speed.

Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
主站蜘蛛池模板: 欧美视频xxx| 中文字幕在线观看一区二区 | 日本高清wwww免费视频 | 国产一区二区三区免费在线视频 | 成人18视频日本 | 日日摸天天摸狠狠摸视频 | 天天躁日日躁狠狠躁中文字幕老牛 | 一区二区三区视频网站 | 国产精品玖玖玖影院 | 国产大片免费在线观看 | 欧美papa | 国内精品视频一区二区三区 | 曰逼网站 | 日韩精品欧美 | 日本一区二区三区不卡在线视频 | 欧美亚洲国产日韩 | 国产成人无精品久久久久国语 | 狠狠色狠狠色 | 日本毛片在线看 | 日本不卡视频在线播放 | 在线播放成人高清免费视频 | 日本高清免费毛片久久看 | 色综合久久中文色婷婷 | 国产基zz视频日本在线观看 | 日本不卡高清免费v日本 | 亚洲欧美精品成人久久91 | 日本hdxxxxxhd15日本 | 国产精品免费看久久久香蕉 | 亚洲欧美日产综合一区二区三区 | 久久精品中文字幕第一页 | 欧美一级特黄刺激大片视频 | 天天操夜操 | 中文一区| 成人免费久久精品国产片久久影院 | 国产欧美日韩一区二区三区在线 | 中文字幕另类 | 久久久久一区二区三区 | 国产 日韩 欧美在线 | 男女啪啪免费视频网站 | 亚洲精品中文字幕在线 | 亚洲精品一区二区三区第四页 |