欧美一级高清免费a-欧美一级高清片欧美国产欧美-欧美一级高清片在线-欧美一级高清视频在线播放-欧美一级高清在线观看-欧美一级黄色录像

Welcome to Shenzhen Zhongyuan Plastic Co., Ltd!

News



Tel:(0755)27151698
Fax:(0755)27150611
Mailbox:szzyzcl@163.com / szzy@szzy99.com
Add:Building A1 and A2, No.1 Industrial Zone, yuliu property company, Gongming town, Bao'an District, Shenzhen
Industry information

當前位置:

首頁 News Industry information

Solution to lack of glue in plastic shell

Release time:2023-11-29

Lack of glue, also known as insufficient filling, is one of the common problems in the process of injection molding. The injection molding part is not full, and the existing bubbles, cavities, shrinkage holes, etc. are inconsistent with the standard template, which is called lack of glue. So how to solve itPlastic shellWhat about the lack of glue?

圖片2.png


The following are the reasons for the lack of glue in the plastic shell and its improvement measures:


① Mold: a. the design of the gating system is unreasonable. The gating system is the channel for the melt to enter the mold cavity, which has a great impact on the molding quality of the plastic parts. The gate is not parallel and the gate is not located at the wall thickness; b. The exhaust structure of the mold is poor; c. Impurities or cold materials in the melt block the flow channel; d. Mold temperature does not meet the requirements. Improvement measures: improve the pouring system, increase the exhaust of the mold, remove the impurities of the compound, and increase the mold temperature.


② Raw materials: a. the water content of raw materials is too large; b. Volatile substances in raw materials exceed the standard; c. There are too many impurities or recycled materials in the raw materials. Improvement measures: barbecue raw materials and increase raw materials.


③ Injection molding machine: A. insufficient injection quantity: for example, 180t products are produced by 150t machines. b. The nozzle is blocked by foreign matters and the nozzle hole is too small; c. Insufficient supply of raw materials: if the barrel is blocked, the nozzle material will affect the blanking; d. Check valve failure; e. Insufficient injection stroke. Improvement measures: increase the injection volume and increase the injection stroke.


④ Molding operation: A. mold temperature is too low; b. The injection pressure is too low; c. The pressure holding time is too short; d. The injection speed is too slow; e. The melt temperature is too low. Improvement measures: increase the mold temperature, increase the injection pressure, maintain the pressure time, and improve the injection speed.

Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
主站蜘蛛池模板: 久久国产精品1区2区3区网页 | 99pao在线视频精品免费 | 亚洲第一区精品观看 | 5g成人影院天天5g影天天爽 | 日本免费a视频 | 99热日韩| 亚洲网站在线看 | 爱爱视频在线播放 | 国产精品变态重口在线 | 91精品网站 | 日本一区二区不卡在线 | 伊人久久综在合线亚洲91 | 中文字幕人成乱在线视频 | 久久久久久99 | 亚洲 欧美 日韩 精品 | 四虎影院永久免费观看 | 日本亚洲黄色 | 综合久久久久久久综合网 | 亚洲欧美网| 国产精品久久久久免费 | 亚洲精品视频专区 | 亚洲一区免费在线观看 | 亚洲在线精品视频 | 久久999精品 | 中文字幕 日韩在线 | 国产精品v欧美精品v日本精 | 91青青在线视频 | 999精品在线视频 | 国产精品久久久久久麻豆一区 | 精品久久久久久久九九九精品 | 天天玩天天操 | 99久久国产亚洲综合精品 | 开心色99×xxxx | 日日摸夜夜搂人人要 | 午夜一级成人 | 欧美日韩在线亚洲国产人 | 精品午夜久久网成年网 | 婷婷综合久久中文字幕一本 | 亚洲精品综合 | 91久久老司机福利精品网 | 久久综合给会久久狠狠狠 |