欧美一级高清免费a-欧美一级高清片欧美国产欧美-欧美一级高清片在线-欧美一级高清视频在线播放-欧美一级高清在线观看-欧美一级黄色录像

Welcome to Shenzhen Zhongyuan Plastic Co., Ltd!

News



Tel:(0755)27151698
Fax:(0755)27150611
Mailbox:szzyzcl@163.com / szzy@szzy99.com
Add:Building A1 and A2, No.1 Industrial Zone, yuliu property company, Gongming town, Bao'an District, Shenzhen
Industry information

當前位置:

首頁 News Industry information

Precautions for injection molding

Release time:2024-06-05

1. Shrinkage in injection molding isInjection moldingIt is a very common problem, especially for plastic products with high surface quality requirements. Therefore, with the continuous improvement of injection molding technology, it is imperative to minimize the shrinkage of injection molding and improve product quality.

1.jpg


2. The shrinkage formed in the thicker part of plastic parts (such as ribs or protrusions) is more serious than that of adjacent parts. This is because the thicker part cools much slower than the surrounding area. Different cooling rates will lead to the formation of dents on the joint surface, which is called shrinkage marks. This defect seriously limits the design and molding of plastic products, especially large thick wall products such as TV inclined boxes, display boxes and so on. In fact, products with strict requirements such as household appliances need to remove shrinkage holes, while toys and other products with low surface quality requirements are allowed to have shrinkage marks during injection molding.


3. There may be one or more reasons for forming shrinkage marks in injection molding, including processing method, part geometry, material selection, mold design, etc. Geometry and material selection are usually decided by the raw material supplier and cannot be easily changed. However, in mold manufacturers, there are many factors related to mold design that may affect the shrinkage of injection molding. The design of cooling channel, gate type and gate size may have different effects. For example, a small gate, such as a tubular gate, cools much faster than a conical gate. Premature cooling of the gate will reduce the filling time of the cavity, thereby increasing the possibility of shrinkage marks. For molding workers, adjusting processing conditions is a way to solve the shrinkage problem in injection molding. Filling pressure and time significantly affect the shrinkage. After the part is filled, the excess material continues to fill the cavity to compensate for the shrinkage of the material. If the filling stage is too short, the shrinkage will intensify and eventually produce more or larger shrinkage marks. This method to solve the shrinkage of injection molding itself may not be able to reduce the shrinkage mark to a satisfactory degree, but the molding workers can adjust the filling conditions to improve the shrinkage mark.

Copyright: Shenzhen Zhongyuan Plastic Co., Ltd. | mold processing customized manufacturer. If you want to know the processing price of the factory, how much is it, and which is good, please contact us Yue ICP Bei No. 17060480
主站蜘蛛池模板: 狠狠躁 | 看逼网站| 亚洲男人天堂色 | 国产91免费在线 | 成人综合婷婷国产精品久久免费 | 亚洲激情视频在线播放 | 日日干日日干 | 青草视频在线免费观看 | 国产精品永久免费自在线观看 | 韩国免费一级成人毛片 | 日本人泡妞18xxⅹ免费视频 | 日本一级www乱码在线 | 人善交video欧美 | 狠狠噜天天噜日日噜 | 高清在线亚洲精品国产二区 | 亚洲福利网址 | 国产精品四虎在线观看免费 | 中文字幕第4页 | 国产欧美综合一区二区 | 精品久久久久久久久久 | 亚洲网视频 | 青青青在线日本免费视频 | 国产91系列| 国产精品人人做人人爽 | 成人18网址在线观看 | 四虎成人免费网站在线 | 国产高h| 国产精品久久久久久久人热 | 看免费人成va视频全 | 国产小视频在线观看www | 91av在线视频观看 | 久久久久在线视频 | 日韩三级影院 | 99这里都是精品 | 中文无码日韩欧免费视频 | 91成人免费视频 | 成人私拍福利视频在线 | 亚洲另类欧美日韩 | 91在线亚洲精品一区 | 日韩色视| 91短视频在线看 |